Posted on September 26, 2017 by ParsCo Construction
CIVICCON: Empowering Pensacola Through Civic Conversation.
The Pensacola News Journal in partnership with the Studer Community Institute is transforming opportunities for all.
1. Good Planning
2. Excellent Infrastructure
3. Building Prosperity
4. Civic Engagement
5. Community Caring
Great Things Are Taking Place in Pensacola, Florida.
1) There is more new construction taking place now that anytime in modern history.
2) Small businesses are strong and growing.
3) Downtown Pensacola is healthier than it has been in years.
4) A clear focus has been established for getting children ready for kindergarten
5) Pensacola State College and the University of West Florida are growing.
Leave a comment
Posted on September 25, 2017 by ParsCo Construction
In the long established design-bid-build method of construction project delivery, a project is entirely designed before being built.
In addition to estimating, ParsCo Construction provides design decisions, evaluations, studies, value engineering, value analysis, scheduling, constructability reviews, and more.
Design costs, permitting, land acquisition, and life-cycle costs are also evaluated.
The design-bid-build process facilitates a guaranteed maximum price (GMP) for the project.
Leave a comment
Posted on September 18, 2017 by ParsCo Construction
What different types of jobs are available in today’s Construction market?
The University of West Florida is hosting a “Careers in Building Construction” forum on Thursday, September 28, 2017.*
Join us from 6:00pm until 7:00pm to explore a career in construction!
Construction professionals are in heavy demand in any of several construction-related careers.
Networking begins at 5:30.
Leave a comment
Posted on September 11, 2017 by ParsCo Construction
Without clear direction, people can get easily lost along the way.
Construction planning is a fundamental and critical activity in the management and execution of construction projects.
Pre-planning is an extremely critical component in the building process and is directly related to staying within budget and time.
Contact Us to schedule your pre-planning logistics and project consultation.
Leave a comment
Posted on September 8, 2017 by ParsCo Construction
624230
236220 Commercial and Institutional Building Construction
562910 Remediation Services
624230 Emergency and Other Relief Services
238910 Site Preparation Contractors
526910 Remediation Services
236115 New Single Family Housing Construction
236116 New Multifamily Housing Construction
238160 Roofing Contractor
238310 Drywall and Insulation
444190 Other Building Material Dealers
562998 Misc. Waste Management Services
561320 Temporary Help Services
541350 Building Inspection Services
926110 Administration of General Economic Programs
561720 Janitorial Services
56211 Waste Collection
238990 All Other Specialty Trade Contractors
321991 Manufactured Home (Mobile Home) Manufacturing
453930 Manufactured (Mobile) Home Dealers
336212 Truck Trailer Manufacturing
624190 Other Individual and Family Services
Leave a comment
Posted on September 7, 2017 by ParsCo Construction
In any disaster, time is of the essence and pro-active planning will speed up the recovery process, limit financial loss, and minimize business interruption.
ParsCo understands the needs of our clients, especially when they have been affected by a natural disaster. ParsCo addresses those times with a sense of urgency, providing our clients with lots of attention and the utmost responsiveness.
Time is of the essence, and a short delay in response can mean all the difference in construction costs, and the client’s ability to function as a business.
Some of the key factors that you should carefully consider when evaluating the ParsCo Disaster Response Team:
1) ParsCo, LLC regularly self performs the following disciplines: Site work, site utilities, framing, drywall, wood trim, painting and plumbing. Self performing some or all of these disciplines has repeatedly allowed us to control project specific issues related to design, schedule, quality control, and cost. This ability to address emergency situations with our own forces is a tremendous advantage in times of emergency or disasters. There is no need to find a subcontractor to perform the work, because we complete these scopes ourselves.
2) ParsCo owns property within the Florida Panhandle with materials and storage available for bulk materials that may be required in time of a disaster. Having the ability to stockpile these materials means no matter what the material shortage may be in the area, we will be ready to address the re‐construction effort without delay.
3) ParsCo has managed single projects as small as $1,000 and as large as $185,000,000. You will get the experience of larger construction firms while receiving services specific to your needs.
Below is a list of items we will ask you to provide ParsCo in order to assist us should the need to utilize our services arise. The following documents will help us gather information about your facilities so we can respond in a timely and efficient manner to minimize loss.
The key to mitigating any type of loss is the ability to react and the ability to react is driven by communication and information.
Below is a list of items we will ask you to provide ParsCo in order
to assist us should the need to utilize our services arise.
HURRICANE/STORM EVACUATION PLAN/PROCEDURES
SITE PLANS/MAPS (drawings of every building)
Aerial Maps or Key Maps
GPS COORDINATES (street signs are not always left standing)
ROOFS (type of roofs on buildings – i.e. flat roof, etc.)
NEW CONSTRUCTION RENOVATIONS
PRE-PLANNED AGREEMENTS ON GENERATORS, (Admin. Offices, Server, Freezers)
ASSESSMENT OF DAMAGES (Both parties)
LIST OF BUILDINGS AND SQUARE FOOTAGE
“KEY MASTER” – Someone who can provide us with keys for every door in every building. It is very important that we have instant access. In the past, people who had the keys had evacuated and did not return for several days which delayed the recovery process. If possible, we would like to have a set of keys.
BUILDING PRIORITY LIST (if there is widespread damage, which buildings are most critical to bring back on line first?)
DESIGNATED MEETING PLACE (to meet after storm). Communication may be down for days for storms, including cell phone towers.
COMMAND CENTER – Determine a designated location that could be in place for 60 days, if required. Space would need to be large enough to accommodate large equipment and materials.
Area will need to be on pavement and placed on high ground.
ASBESTOS SURVEYS (of all buildings)
LEAD PAINT SURVEYS (of all buildings)
Questions: info@pars-co.net
Leave a comment
Posted on August 28, 2017 by ParsCo Construction
Framing, in construction, is the fitting together of pieces to give a structure support and shape.
Framing materials are usually wood, engineered wood, or structural steel.
Leave a comment
Posted on August 24, 2017 by ParsCo Construction
NAHB serves the home building, development and remodeling industry by promoting policies that encourage the production of quality housing that meets the needs of families across the economic spectrum.
We stand for a safe workplace, cost-effective rules and regulations and sustainable construction practices.
The Home Builders Association of West Florida is a membership driven networking and advocacy group focused on the needs of the building & development industry and related business in Escambia and Santa Rosa County.
Leave a comment