Construction Feasibility and Cost Engineering Reviews

Posted on by ParsCo Construction

Cost Management and Construction Feasibility Reviews are critical components in design.  Unfortunately, many design professionals and Owners don’t recognize the benefits until it is too late and their project is either shelved or undergoes a complete redesign. It is frustrating for Owner’s, Design Professionals, and even Contractors when money is spent on a design that doesn’t meet the budget. That is why a ParsCo professional is essential to the equation. 

Our cost engineers participate in the program from its inception, evaluating financial considerations from the planning phase through close-out. We work with the client to ensure the program budget is based on accurate funding estimates and expected program costs. Our estimators and schedulers work together to anticipate when program milestones will be met, and what monies will be coming in and going out as a result. In addition, we regularly conduct risk and cost analyses to determine the probability that a project or effort will stay within budget.


Cost Estimating and Cost Engineering for Designers

The early establishment of a quantified, accurate and structured project budget, coupled with ongoing interactive budget monitoring and reporting, leads to a cost conscious design team capable of responding to budget constraints without adversely impacting the project or wasting precious time and the Owner’s money on a design that can’t be built. 

Our cost engineers are experts at developing all types of cost estimates, at all stages of design, including:

  • Order-of-magnitude/program estimates
  • Conceptual estimates
  • Schematic estimates
  • Alternative design cost analyses
  • Design development estimates
  • Construction documents estimates
  • Bid analyses/contract negotiations
CASE STUDY:
Most recently ParsCo was contacted to provide a last minute construction feasibility estimate for a small new project in Gulf Breeze, FL. The design team recognized the value in knowing prior to bid time whether the design would meet the County’s limited budget constraints. ParsCo helped this customer by providing an overall price based on unfinished and incomplete design drawings which allowed the design team to modify and steer the design to meet the budget constraints. 


Photo renderings by STOA

Tiger Point Community Center

  • Location: Gulf Breeze, Florida
  • Cost: $1,097,000
  • Square Footage: 10,388
  • Client: Santa Rosa County

Project Description: STOA Architects partnered with Atkins Global to design a state-of-the-art community center and stand alone concessions for the Tiger Point community. STOA worked closely with the County to design a modern, functional, low maintenance design for the county and its residents. ParsCo provided cost engineering to assist the design team in making this beautiful design a reality for the customer. 

http://www.pars-co.net
Construction Management

Leave a comment


Selecting Superior Granite and Marble

Posted on by ParsCo Construction

ParsCo professionals have constructed multi-million dollar projects and when working on a high-end project most owners want top of the line finishes. One of the best materials that you can use to get the “wow” factor are granite and marble. Having worked with companies all over the Gulf Coast, ParsCo can confidently endorse and recommend Superior Granite in Pensacola, FL. (www.superior-granite.com)

Superior Granite is a fabricator of natural stone for the Gulf Coast area, servicing Florida, Alabama and Mississippi. Their scope of work involves everything from residential kitchens, countertops, and fireplaces to large scale commercial bids and contracts. They have one of the only “true” state of the art facilities where they are able to maintain impeccable quality control standards. They are also one of the only natural stone fabricators that use the most precise and best programmable equipment to fabricate all of their stone. 

Superior Granite also has one of the largest and widest selections of natural stone products along the Gulf Coast. 


http://www.pars-co.net
Construction Management

Leave a comment




Benefits of using Pre-engineered trusses

Posted on by ParsCo Construction

ParsCo is often asked why they use pre-engineered truss systems on projects.  ParsCo prefers a pre-engineered wooden truss system because of the many advantages this system offers over other types of structural framing. Because they are precisely engineered, wooden trusses are capable of spanning greater distances than traditional joist framing. This results in more design flexibility and fewer intermediate supports, such as columns. The open triangle structure of a wooden truss also makes it easy for installers to fit mechanical and electrical components within the floor or roof framing. When a ParsCo project manager works on your project they focus on utilizing these features in maximizing the design and creating flexibility to provide Owners with options ordinary contractors may not offer. 

Trusses are engineered to specific sizes. This means that every truss will have exactly the same dimensions, making it easy for installers to fit the trusses to the surrounding structure. This results in greater quality in construction.
Another benefit is that there are fewer surprises during construction, and the job can be completed much faster. This is particularly advantageous during roof construction. A wooden truss system allows roofers to get the building closed in quickly, which keeps building materials and workers protected from rain and other weather conditions. It accelerates the dry-in process thus helping your project move faster towards completion. 
Many builders who use wooden truss systems choose to leave the trusses exposed. This allows the truss to become part of the building’s aesthetic design, and is widely used in buildings with a rustic or traditional style. A wooden truss can be built to almost any shape and design to fit any architectural plan. They can have a low-profile design for flat roofs and floors, or a gabled style for sloped roofs. Trusses can even be designed to create a cathedral or arch-shaped roof. Exposed rafter tails is another feature that has become increasingly popular here along the Gulf Coast.
One of the most widely recognized advantages of a wooden truss is the reduced cost of this type of framing. Because of their precise engineering, trusses require less material than joists constructed on site. This leads to lighter loads for wall framing and foundation systems, which can cut costs and help speed up the project. The trusses can be installed much more quickly than wooden joists, and require less skilled labor, resulting in significant labor cost reductions.
Trusses arrive on a flat bed truck as shown below. This photo was taken today on a new ParsCo project that involves Pre-engineered trusses.

So in summary here are some of the benefits of using Pre-engineered trusses are:
1. They are generally a lot less expensive than on site framing.
2. You can have interesting features, like cathedral ceilings, at a low cost.
3. Since all the weight of the roof is transferred to the exterior walls, none of the interior stud walls are load bearing. This facilitates room design and allows for larger ceiling spans. It also facilitates remodeling, if necessary, later on.
4. Any skilled carpenter can set roof trusses in a short period of time saving on framing labor.
5.  They can be installed quickly which increases productivity and improves the project schedule. 
Here is a house constructed by ParsCo using two different types of trusses on the same floor level, common trusses and scissors trusses. In this photo you can see that we decided to use scissors trusses for the vaulted ceiling area and common trusses for the flat ceiling area.
Scissors truss photo example above. 
ParsCo’s new home designs have been trending with Owner’s requests for large “open areas and high ceilings” that either require a truss system (roof and/or floor) OR, an engineered framing system that uses some or all of the following: steel beams, large wood beams, posts, heavier joists & rafters, or supporting walls.

Posts and beams can be replaced with flat trusses as shown above on a previously built ParsCo project. 
Flat truss image above. 
The benefits of using Pre-engineered trusses far outweighs the alternative conventional approach. Stay tuned for more info from ParsCo on another growing trend that involves Pre-engineered and Pre-fabricated wall systems. 
For more info on these building systems contact ParsCo at 850-776-6265. 
www.pars-co.net

http://www.pars-co.net
Construction Management

Leave a comment



ParsCo and Varco Pruden Buildings

Posted on by ParsCo Construction
ParsCo is proud to announce the future partnership with Varco Pruden Buildings. 

VP Buildings specializes in the computer-aided design of pre-engineered steel systems construction for low-rise, nonresidential buildings. Working closely with architects, engineers, and contractors, we offer buildings that combine extraordinary esthetic appeal with optimum functionality. For examples, visit our Hall of Fame.

Steel systems construction can be used for a wide variety of buildings, including:

With advanced construction methods, we can incorporate glass, brick, stone, or pre-cast concrete for special purpose or distinctive appeal.

WORLD LEADER IN STEEL SYSTEMS CONSTRUCTION

VP Buildings is a world leader in the pre-engineered steel systems construction industry, each year manufacturing approximately 6,000 buildings ranging from 1,200 square feet to more than one million square feet under roof. With headquarters in Memphis, Tennessee, we operate six strategically located manufacturing and service centers from coast to coast. Our network of more than 1,000 independent Authorized VP Builders offers state-of-the-art design/build services in local communities across the United States and Canada, as well as throughout Central and South America, Europe, and Asia.

For more information on how ParsCo can provide you with a VP building call 850-776-6265. 

www.pars-co.net

www.vp.com

http://www.pars-co.net
Construction Management

Leave a comment


Good information

Posted on by ParsCo Construction

ParsCo Project Management Consulting Services

When managing a project, a good manager relies on good information to make good decisions.  So what is good information? Good information is that which is used and which creates value. 

Good information is relevant for its purpose, sufficiently accurate for its purpose, complete enough for the problem, reliable and targeted to the right person.  It is also communicated in time for its purpose, contains the right level of detail and is communicated by an appropriate channel, i.e. one that is understandable to the project manager. 

Most companies that have difficulties typically lack organization, procedures, and systems to provide the decision makers with the good information to make good decisions. 

“With good information you make good decisions, with bad information you make bad decisions, and with no information you make no decisions” states Amir M. Fooladi, President/CEO of ParsCo. 

So what are some of the key points that ParsCo Project Managers focus on when gathering good information?

Availability/accessibility

Information should be easy to obtain or access.  Information kept in a book of some kind is only available and easy to access if you have the book to hand.  

Businesses must have an accessible system to store and find information. ParsCo focuses on setting up systems for this using all the latest technology which makes finding information easy and not a tedious task. 

Accuracy

Information needs to be accurate enough for the use to which it is going to be put.  To obtain information that is 100% accurate is usually unrealistic as it is likely to be too expensive to produce on time.  The degree of accuracy depends upon the circumstances.  At operational levels information may need to be accurate to the nearest penny.  At tactical level department heads may see weekly summaries correct to the nearest $100, whereas at strategic level directors may look at numbers on a larger scale of accuracy. 

Accuracy is important.  As an example, if government statistics based on the last census wrongly show an increase in births within an area, plans may be made to build schools and construction companies may invest in new housing developments. In these cases any investment may not be recouped.

Reliability or objectivity

Reliability deals with the truth of information or the objectivity with which it is presented.  You can only really use information confidently if you are sure of its reliability and objectivity. 

When researching project costs the systems in place to furnish the information have to be solid and free of error otherwise the reliability may be in question. The reliability typically is dependent on the procedures that are followed to gather the information. 

Relevance/appropriateness

Information should be relevant to the purpose for which it is required. It must be suitable.  What is relevant for one manager may not be relevant for another.  The user will become frustrated if information contains data irrelevant to the task in hand.

For example, a market research company may give information on users’ perceptions of the quality of a product.  This is not relevant for the manager who wants to know opinions on relative prices of the product and its rivals.  The information gained would not be relevant to the purpose.

Completeness

Information should contain all the details required by the user. Otherwise, it may not be useful as the basis for making a decision. For example, if an organization is supplied with information regarding the costs of supplying a fleet of cars for the sales force, and servicing and maintenance costs are not included, then a costing based on the information supplied will be considerably underestimated.

Ideally all the information needed for a particular decision should be available but there is always an inherent variable that a Project manager has to account for that can’t be based on information. The unknowns are calculated and determined based on the expertise of the project manager. 

Timing

Information must be on time for the purpose for which it is required. Information received too late will be irrelevant. One example is accounting, which should always be maintained and up to date. 


For more information on how ParsCo can help your business be more successful call 850-776-6265. 

www.pars-co.net




http://www.pars-co.net
Construction Management

Leave a comment




All Rights Reserved © 2024. Site Designed By: CYber SYtes, Inc. Orchestrating the Web.